

- A3
- A4
-
Lifting hook
Gantry crane for shield tunneling machine is used for lifting of the cutter and shield body of underground non excavation shield tunneling machine and the tunnel support segment in the process of the construction. The trolley of this gantry crane is a rotating disc adapts to the demand of different digging direction with flexible operation, perfect safety instructions and overload protection device system.
PLC frequency conversion adjustment system makes it easy to control every mechanism.
Features of Shield Tunneling Machine Gantry Crane:
1. Spreader with 360° rotation is fit for installation of cutter from different angles;
2. Double trolley mechanism is applied for lifting cutter by double trolley or lifting duct piece by single trolley;
Working Environment:
1. 3 phase A.C. 50HZ 380V
2. The temperature of the working environments is -20 ~ +45 degrees and.the Max relative humidity shall be less than 95%( with condensation);
3. Wind speed shall be less than 20m/s;
4. Working leave: A3, A4;
5. Special requests are available;
The shield gantry crane is a highly engineered and robust piece of equipment, purpose - built for heavy - duty applications that demand exceptional strength, precision, and reliability. It has been meticulously designed to meet the rigorous requirements of various building, construction, and engineering projects, making it an invaluable asset in these industries.
In the realm of subway and underground metro railway construction, the shield gantry crane plays a crucial role. Subway construction often involves working in tight, confined spaces underground. The crane's compact yet powerful design allows it to operate effectively in these restricted environments. It is used to lift and transport heavy components such as tunnel segments, which are the precast concrete or steel elements that form the lining of the subway tunnels. These segments can be extremely large and heavy, weighing several tons each. The shield gantry crane, equipped with specialized lifting mechanisms, carefully hoists these segments from the material storage area and precisely positions them into place during the tunnel - building process. Its high - precision control system ensures that each segment is accurately aligned, contributing to the integrity and stability of the tunnel structure. Additionally, the crane is utilized for moving other essential equipment, like shield machines themselves. Shield machines are large, complex devices used to excavate tunnels while simultaneously installing the tunnel lining. The shield gantry crane can safely move these massive machines in and out of the tunnel construction site, facilitating the smooth progress of the project.